Analysis of time and cost overrun in Malaysian construction

Sambu Potty, Narayanan and Idrus, Arazi and C.T, Ramanathan (2012) Analysis of time and cost overrun in Malaysian construction. [Citation Index Journal]

[img] PDF - Published Version
Restricted to Registered users only

255Kb

Abstract

The construction industry in Malaysia is very important for creating employment, both directly and indirectly. It faces two repeated problems during the construction stage: slippage of project-schedules, i.e. time overrun and overrun of project cost; to the dislike of owners, contractors and consultants. This paper studies the time delay and cost overrun factors for Design and Build D&B projects in Malaysia. A Questionnaire was used to collect data from practitioners and analyse the responses and rank the factors and groups on overall view of the contracting parties. Identified risk factors from the theoretical domain were used to prepare 79 time related question and 18 cost related question categorized in 9 groups and 1 group respectively. Total of 136 respondents recorded their ratings to the factors in the questionnaire. Labour-related group has the top 1 rank with RII 0.684. The results can be used as a guideline to successfully handle construction projects in Malaysia; contributing for better project performance and lead to positive risks, opportunities.

Item Type:Citation Index Journal
Uncontrolled Keywords:Quantitative analysis, Questionnaire survey, time and cost overrun and Design and Build Projects
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Academic Subject One:Academic Department - Civil Engineering - Structures, materials and construction
Departments / MOR / COE:Research Institutes > Institute for Sustainable Building
ID Code:9814
Deposited By: DR NARAYANAN SAMBU POTTY
Deposited On:11 Jul 2013 00:08
Last Modified:19 Jan 2017 08:22

Repository Staff Only: item control page

Document Downloads

More statistics for this item...