UNSPECIFIED (2012) Generation and load life-cycle cost optimisation study at an offshore hub platform. [Citation Index Journal]
Full text not available from this repository.Item Type: | Citation Index Journal |
---|---|
Depositing User: | Ms Sharifah Fahimah Saiyed Yeop |
Date Deposited: | 19 Mar 2013 06:23 |
Last Modified: | 21 Mar 2013 08:10 |
URI: | http://scholars.utp.edu.my/id/eprint/9157 |