Analysis of time and cost overrun in Malaysian construction

Narayanan Sambu Potty and Arazi Bin Idrus (2012) Analysis of time and cost overrun in Malaysian construction. [Citation Index Journal]

Full text not available from this repository.
Item Type: Citation Index Journal
Depositing User: Ms Sharifah Fahimah Saiyed Yeop
Date Deposited: 19 Mar 2013 06:23
Last Modified: 07 Apr 2013 01:56
URI: http://scholars.utp.edu.my/id/eprint/9120

Actions (login required)

View Item
View Item