Sensitivity Analysis of Hydroelectric Power Generation from Cascading Reservoirs

Asfaw, Tilahun Derib and Wan Yusof, Khamaruzaman and Hashim, Ahmad Mustafa (2013) Sensitivity Analysis of Hydroelectric Power Generation from Cascading Reservoirs. [Citation Index Journal]

[img] PDF
Restricted to Registered users only

339Kb

Official URL: http://www.scientific.net

Abstract

The cascading reservoirs in Perak, Malaysia, were used to test the sensitivity analysis of hydroelectric power generation during refill and deplete period of the reservoirs. The cascading scheme comprises four reservoirs namely Temenggor, Bersia, Kenering and Chenderoh. The test was conducted after the analysis of water balance and stage-storage relationship of each reservoir in the cascading scheme. The result showed that power generation from the smaller reservoir, Bersia, is more sensitive to the change of headrace level, while the larger storage capacity and rated head reservoir is the most sensitive to the change of release. Therefore, to maximize the power generation from the cascading reservoir, the refill operations should be ranked according to the increasing order of the reservoir storage capacity and a reverse order should be followed during deplete period.

Item Type:Citation Index Journal
Uncontrolled Keywords:hydroelectric power, cascading reservoir, sensitivity analysis, refill and deplete order
Subjects:T Technology > TA Engineering (General). Civil engineering (General)
Departments / MOR / COE:Departments > Civil Engineering
Mission Oriented Research > Sustainable Development
ID Code:8554
Deposited By: AP Ahmad Mustafa Hashim
Deposited On:13 Dec 2012 11:39
Last Modified:19 Jan 2017 08:21

Repository Staff Only: item control page

Document Downloads

More statistics for this item...