A., Shafeeq and M.I.A., Mutalib and K.A., Amminudin and A., Muhammad (2008) Scheduling three stage flowshop processes with no intermediate storage using novel matrix approach. [Citation Index Journal]
![]() |
PDF
Restricted to Registered users only 11Kb |
Official URL: http://www.scopus.com/inward/record.url?eid=2-s2.0...
Abstract
Scheduling optimization normally aimed at minimizing makespan, leading to overall optimization of the production cost. This study focuses on determining the production sequence with minimum makespan for scheduling of a flowshop process using no intermediate storage (NIS) transfer policy. Unlike previous methods which uses mathematics considerably and lacks interactivity, the method introduces a simple approach based on matrix formulation to determine the makespan for all possible batch production sequences thus allowing simple screening to be done for selecting the optimal sequence. © 2008 Asian Network for Scientific Information.
Item Type: | Citation Index Journal |
---|---|
Uncontrolled Keywords: | Batch process; Matrix; No intermediate storage; Scheduling |
Subjects: | T Technology > TP Chemical technology |
Departments / MOR / COE: | Departments > Chemical Engineering |
ID Code: | 522 |
Deposited By: | Assoc Prof Dr Mohamed Ibrahim Abdul Mutalib |
Deposited On: | 09 Mar 2010 02:04 |
Last Modified: | 19 Jan 2017 08:26 |
Repository Staff Only: item control page