Logo

One Week Ahead Short Term Load Forecasting

Baharudin, Zuhairi and Kamel , Nidal (2007) One Week Ahead Short Term Load Forecasting. In: The Seventh IASTED European Conference on Power and Energy Systems (EuroPES 2007), August 29 – 31, 2007, Palma de Mallorca, Spain.

[img] PDF (One Week Ahead Short Term Load Forecasting) - Accepted Version
Restricted to Registered users only

121Kb

Official URL: http://www.iasted.org/

Abstract

Short-term load forecasting plays an important role in planning and operation of power system. The accuracy of this forecasted value is necessary for economically efficient operation and also for effective control. This paper describes a method of autoregressive Burg in solving one week ahead of short term load forecasting. The proposed method is tested based from historical load data of National Grid of Malaysia and load demand in New South Wales, Australia. The accuracy of proposed method, i.e., the forecast error, which is the difference between the forecast value and actual value of the load, is obtained and reported.

Item Type:Conference or Workshop Item (Paper)
Subjects:T Technology > TK Electrical engineering. Electronics Nuclear engineering
Departments / MOR / COE:Departments > Electrical & Electronic Engineering
ID Code:4358
Deposited By: Dr Zuhairi Baharudin
Deposited On:16 Feb 2011 04:14
Last Modified:19 Jan 2017 08:27

Repository Staff Only: item control page

Document Downloads

More statistics for this item...