A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects

Ramanathan, C.T. and Narayanan, S.P. (2014) A comparative study among stakeholders on causes of time delay in Malaysian multiple design and build projects. In: UNSPECIFIED.

Full text not available from this repository.
Official URL: https://www.scopus.com/inward/record.uri?eid=2-s2....

Abstract

The construction industry plays an important role in developing a nation to a fully developed status. The construction industry, unlike other industries has unique problems concerning project completion. Projects are now more complicated involving huge contract values, participants from multi-discipline, more specialised works, tighter schedule, more cost consciousness, stringent quality standards, etc. Ultimately, cost and time are the two key parameters that play significant role in construction project management. In Malaysia very few studies have been attempted on the factors causing time delay. Besides, there has been no such study related to multiple Design and Build (DandB) projects. The study focused on DandB projects which have complicated risk governed with fixed time and a fixed contract sum (Lump sum). Thus there is a need for comparative study on the risk factors causing this time delay which enables the Malaysian construction to respond proactively and more effectively to time delay factors. © 2014 IEEE.

Item Type: Conference or Workshop Item (UNSPECIFIED)
Impact Factor: cited By 5
Uncontrolled Keywords: Construction industry; Risk analysis; Risk assessment; Time delay, Comparative studies; Construction project management; Design and build; Multi disciplines; Multiple projects; Project completion; Qualitative risk analysis; Quality standard, Project management
Depositing User: Ms Sharifah Fahimah Saiyed Yeop
Date Deposited: 29 Mar 2022 03:35
Last Modified: 29 Mar 2022 03:35
URI: http://scholars.utp.edu.my/id/eprint/31701