Bayuaji, R. and Biyanto, T.R. and Irawan, S. (2015) Design of cement plant waste heat recovery generation. In: UNSPECIFIED.
Full text not available from this repository.Abstract
Waste heat in cement plant is a huge waste heat from kiln and raw mill plant. Such as ordinary power plant, waste heat recovery generation consist of various operation units ie., economizer, evaporator, super heater, steam drum, and turbine. In order to obtain the optimal heat recovery, proper operation units should be designed and arranged optimally. This paper describes heat recovery unit operations modelling using Aspen HYSYS software. Hysys can be utilized as single tool for design and simulate WHRG system. The steady-state and dynamic process simulation, simulate pinch analysis result, area of heat transfer and roughly cost-estimation could be provided using this tool. The results show the Aspen HYSYS model could provide satisfied engineering design data that could be used in construction stage. © 2015 IEEE.
Item Type: | Conference or Workshop Item (UNSPECIFIED) |
---|---|
Impact Factor: | cited By 2 |
Uncontrolled Keywords: | Cement plants; Cements; Cost estimating; Design; Heat transfer; Models; Steam power plants; Waste heat, Construction stages; Cost estimations; Dynamic process simulation; Engineering design; Heat recovery unit; Operation unit; Pinch analysis; Steady state, Waste heat utilization |
Depositing User: | Ms Sharifah Fahimah Saiyed Yeop |
Date Deposited: | 30 Aug 2021 08:54 |
Last Modified: | 30 Aug 2021 08:54 |
URI: | http://scholars.utp.edu.my/id/eprint/26191 |