Using a developed PM in order to optimize the production productivity in a cement industry

ASSADI, M.KH (2011) Using a developed PM in order to optimize the production productivity in a cement industry. J. Appl. Sci. Environ. Manage, 15 (2). pp. 381-389. ISSN JASEM ISSN 1119-8362

[thumbnail of 13Using a developed PM in order to optimize the productivity in a cement Industry.pdf]
Preview
PDF
13Using a developed PM in order to optimize the productivity in a cement Industry.pdf

Download (296kB) | Preview

Abstract

Cement factories are highly energy and cost intensive industries. Producing the cement
requires a lot of energy to transform the raw material into final product. One major area to improve the
production productivity is preventive maintenance (PM). It helps to protect assets, increase the useful life of
equipment, improve system reliability, decrease cost of replacement and finally improve system energy
consumption.
In this paper, the theory of microeconomics firm was used to find a model of optimal production productivity
in cement industry. To show the effect of preventive maintenance system in the model, energy consumption of
equipment is considered as a function of failure rate of equipment and then added to the set of constraints.
Using this model energy consumption is reduced up to 15% and total annual cost is reduced up to 12.7%.

Item Type: Article
Uncontrolled Keywords: Preventive maintenance (PM), Energy saving, Cement industry, Production productivity
Subjects: T Technology > TJ Mechanical engineering and machinery
Departments / MOR / COE: Research Institutes > Energy
Depositing User: Unnamed user with username haminas2
Date Deposited: 19 May 2015 03:39
Last Modified: 19 May 2015 03:39
URI: http://scholars.utp.edu.my/id/eprint/11667

Actions (login required)

View Item
View Item