Logo

Techno-Economic Assessment of Redundancy Systems for Cogeneration Plant

Abd Majid, Mohd Amin (2014) Techno-Economic Assessment of Redundancy Systems for Cogeneration Plant. [Citation Index Journal]

[img] PDF
127Kb

Abstract

The use of distributed power generation has advantage as well as disadvantage. One of the disadvantages is that the plant requires a dependable redundancy system to provide back up of power during failure of its power generation equipment. This paper presents a study on techno-economic assessment of redundancy systems for a cogeneration plant. Three redundancy systems were investigated; using public utility,generator set and gas turbine as back up during failures. Results from the analysis indicate that using public utility provides technical as well as economic advantages in comparison to using generator set or turbine as back up. However, the economic advantage of the public utility depends on the frequency of failures the plant will experience as well on the maximum demand charge. From the break even analysis of the understudied plant, if the number of failures exceeds 3 failures per year for the case of maximum demand charge of RM56.80, it is more economical to install a generator set as redundancy. The study will be useful for the co-generator operators to evaluate the feasibility of redundancy systems.

Item Type:Citation Index Journal
Academic Subject One:Mechanical Engineering
Departments / MOR / COE:Departments > Mechanical Engineering
ID Code:11640
Deposited By: AP Ir Dr Mohd Amin Abd Majid
Deposited On:28 Apr 2015 02:54
Last Modified:28 Apr 2015 02:54

Repository Staff Only: item control page

Document Downloads

More statistics for this item...